Project Description
Supply, installation, testing and commissioning of ballastless track of Broad-Gauge corridor from Dilshad Garden to Ghaziabad Bus Adda (Line-1 Extn.) & Noida (Line 4 Exten) in elevated section of Delhi MRTS project of phase III.

Date of completion: 05/02/2019

UG: 0
FBW (NOS): 1322
ATW (NOS): 117
T/O & SCO (Nos):
2

Project Description
Contract CT-19B-1: Supply, Installation, Testing and Commissioning of Ballastless track work of Standard Gauge Corridor from Sector 71 Ch.(-) 495 station to sector 81 station Ch. 4150 (Excluding) in elevated section of Greater Noida corridor of Noida Metro project

Date of completion: 21/12/2018

UG: 0
FBW (NOS): 2100
ATW (NOS): 250
T/O & SCO (Nos):
4 Turnouts, 2 SXO

Project Description
Contract CT-19B-3: Supply, Installation, Testing and Commissioning of Ballastless track work of Standard Gauge Corridor from Sector 137 Station (Excluding) to Sector 147 Station (Excluding) i.e. Chainage 9062 to 14271 in elevated sections of Greater Noida Corridor of Noida Metro Regarding: Material Reconciliation

Date of completion: 25-09-2019

UG: 0
FBW (NOS): 2300
ATW (NOS): 300
T/O & SCO (Nos):
15

Project Description

Installation, Testing, and Commissioning of Ballastless Track of Standard Gauge, of North-South corridor in elevated and Underground sections along with Ballasted/Ballastless Tracks in Transportnagar Depot of Lucknow Metro Phase I A project. Contract LKT-5

Date of completion: 31-03-2019

UG: 7.105 
FBW (NOS): 3676
ATW (NOS): 1029
T/O & SCO (Nos):
Turnouts – 15 nos, SXO – 2 nos, SXO with MSS – 1 nos

Design and Installation for 7.1 Km in Underground Cut & Cover and 1 Scissor Crossover

 

Project Description
CT 33-RRR: Supply, Installation, Testing And Commissioning Of Ballast Less Track Stabling Lines On Elevated Depot At Noida Electronic City In Connection With Extension From Noida City Centre To Noida Sector 62 (Line 3 Extn.) Of Broad Gauge Corridor Of Delhi MRTS Project Of Phase III

Date of completion: 30-04-2022

UG: 2.233 
FBW (NOS): 1200
ATW (NOS): 200
T/O & SCO (Nos):
Turnouts – 10 Nos, SXO – 2 Nos (one with full surface MSS

Underground stretch of 2.23 KM laid with full surface MSS

 

Project Description
MT-5: Supply, Installation, Testing & Commissioning Of Ballastless Track Work Of Standard Gauge From Dahisar East (Ch.414.348) To Kamraj Nagar (Incl. Ch. 8579.434) Elevated Section of Line 2a Corridor Along With Charkop Depot Of Mumbai Metro Rail Project Of MMRDA

Date of completion: 30-04-2022

UG: 0
FBW (NOS): 2300
ATW (NOS): 400
T/O & SCO (Nos):
Turnouts – 21 Nos, SXO – 1 No

MSS with Design, Supply, and Installation at all elevated Stations – 9 Nos.

Project Description

MT-6: Supply, Installation, Testing & Commissioning Of Ballastless Track Work Of Standard Gauge From Kamraj Nagar (Excluding) (Ch 8579.434) To Dn Nagar (Ch -18174.417) Elevated Section of Line 2a Corridor Of Mumbai Metro Rail Project Of MMRDA

 

Date of completion: 31-12-2022

UG: 0
FBW (NOS): 2050
ATW (NOS): 150
T/O & SCO (Nos):
Turnouts 8 Nos

MSS with Design, Supply, and Installation at all elevated Stations – 8 Nos.

Project Description
CT 36: Supply, Installation, Testing And Commissioning Of Ballast Less Track Stabling Lines in Underground Section Of Airport Express Line From Dwarka Sector-21 To ECC Dwarka Sector-25 Standard Gauge Corridor Of Delhi MRTS Project Of Phase III

 

Date of completion: 30-04-2022

UG: 4.18
FBW (NOS): 450
ATW (NOS): 150
T/O & SCO (Nos):
Turnouts – 2 Nos with MSS, SXO – 1 No with MSS

Complete underground stretch laid with special Strip + Filler MSS including design, supply, and installation

Project Description

Construction of Ballast Less Track (BLT) on Elevated Viaduct, Underground Tunnel, Station & Yard, and other Miscellaneous Works from Chainage (-) 90m to 7195m i.e. Noapara to Bimanbandar Yard in connection with Extension of Metro Railway from Noapara to Barasat via Bimanbandar.

Date of completion: 31-07-2022

UG: 9.5
FBW (NOS): 2150
ATW (NOS): 300
T/O & SCO (Nos):
Turnouts 13 Nos

Project Description

PACKAGE 1: Design of Broad Gauge Ballastless Track Including Supply, Installation, Testing And Commissioning Between Km 92.548 To Km 101.632 (Approx 12.6 Km) on Katra-Dharam Section of Udhampur-Srinagar-Baramulla Rail Link Project J&K (Work Allotted To JV)

Date of completion: 31-12-2023

UG: 12.6
FBW (NOS): 2000
ATW (NOS): 200
T/O & SCO (Nos):
12 nos 

Project Description
PACKAGE 2: Design of Broad Gauge Ballastless Track Including Supply, Installation, Testing And Commissioning Between Km 42.210 To Km 50.400 & Km 51.715 To Km 61.687 (Approx 22 Km) On Katra-Dharam Section Of Udhampur-Srinagar-Baramulla Rail Link Project J&K (Work Allotted To JV)

Date of completion: 31-12-2023

UG: 22.5
FBW (NOS): 3500
ATW (NOS): 350
T/O & SCO (Nos):
4 Nos

Project Description

Contract DT-05: Installation, Testing & Commissioning of Ballastless Track including Supply of Fastening System, Buffer Stop & Others for Line-7 Extension (Maujpur-Majlis Park) (Ch. 0.0m to Ch. 12098.520m and additional work under variation for U/G section of Delhi MRTS Project of Phase IV

Date of completion: 31-12-2024

UG: 4
FBW (NOS): 3200
ATW (NOS): 400
T/O & SCO (Nos):
Turnout – 2 Nos, SCO – 1 No

Supply of MSS and Installation – 4 TKM
Project Description

MMRDA/ML5/MMRP/CA-166: Design, construction, manufacturing, supply, installation, testing & commissioning of ballast less trackwork in mainline from Kapurbawdi station (CH. -301.373 m) to Dhamankar Naka (CH. 13027.957 m) including third track near Kasheli station, depot entry / exit approach tracks for Line-5 corridor (Thane-Bhiwandi-Kalyan) of Mumbai Metro Rail Project of MMRDA, Mumbai

Date of completion: 31-03-2025

UG: 0
FBW (NOS): 3500
ATW (NOS): 450
T/O & SCO (Nos):
TO – 8 Nos, SCO – 2 Nos

Project Description
Contract MT-09R: Installation, Testing & Commissioning of Ballastless Track including Supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli) (Ch. -822.508m to Ch. 14380.755m)

Date of completion: 31-12-2024

UG:0
FBW (NOS): 3750
ATW (NOS): 500
T/O & SCO (Nos):TO – 13 Nos, SCO – 3 Nos