Depot Track Works – Shastri Park
Location: Yamuna Bank & Najafgarh Delhi
CT-42: “Supply, Installation, Testing & commissioning of Ballastless/Ballasted Track & Associated Civil Work in Shastri Park Depot, Yamuna Bank Depot & Najafgarh Depot for augmentation of Additional Maintenance Facilities”.
- Year Of Completed: Ongoing
- Client: DMRC
- Type of Work: Ballastless/Ballasted Track + Civil Works
Line-7 Extension – Maujpur to Majlis Park
Location: Delhi Metro Line-7 Extension
DT-05: “Installation, Testing & commissioning of Ballastless Track including supply of fastening system, Buffer Stop & others for Line-7 Ext. (Maujpur Majlis Park)”.
- Year Of Completed: Ongoing
- Client: DMRC
- Type of Work: DMRC
NHSRCL – High-Speed Rail Project (Package 1)
Location: Zaroli to Vadodara (Maharashtra-Gujarat)
Track Linking over Viaduct including Setting up of Track Construction Base (TCB) including Flash Butt Welding of rails in connection with Construction of High-Speed Standard Gauge Double Line between Zaroli Village at Maharashtra-Gujarat Border and Vadodara under NHSRCL
- Year Of Completed: Ongoing
- Client: IRCON
- Type of Work: High-Speed Track Linking
NHSRCL – High-Speed Rail Project (Package 2)
Location: Zaroli to Vadodara (Maharashtra-Gujarat)
Track Linking over Viaduct including Setting up of Track Construction Base (TCB) including Flash Butt Welding of rails in connection with Construction of High-Speed Standard Gauge Double Line between Zaroli Village at Maharashtra-Gujarat Border and Vadodara under NHSRCL.
- Year Of Completed: Ongoing
- Client: IRCON
- Type of Work: High-Speed Track Linking
Line-6 – S.S. Nagar to Vikhroli
Location: Mumbai Metro Line-6
MT-09 R – Installation, Testing & Commissioning of Ballastless Track including Supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli).
- Year Of Completed: Ongoing
- Client: DMRC
- Type of Work: Ballastless Track
Line-5 – Kapurbawadi to Dhamankar Naka
Location: Mumbai Metro Line-5 (Thane–Bhiwandi–Kalyan)
MMRDA/L5/MMRP/CA-166: Design, Construction, Manufacturing, Supply, Installation, Testing and commissioning of ballastless trackwork in mainline from Kapurbawadi station to Dhamankar Naka including third track near Kasheli station, depot entry/exit approach track for line 5 corridor (Thane- Bhiwandi- Kalyan) of Mumbai metro rail project.
- Year Of Completed: Ongoing
- Client: MMRDA
- Type of Work: Ballastless Track
Rishikesh–Karan Prayag New Line
Location: Uttarakhand
Broad gauge ballastless track, supply of ballast and installation of track between chainage 6+015 (fls) to 125+200 (fls) in connection with new bg line between Rishikesh and Karan Prayag(125km). Awarded to IRCON-PARAS-PCM JV
- Year Of Completed: Ongoing
- Client: RVNL (IRCON-PARAS-PCM JV)
- Type of Work: Ballastless Track + Ballast Supply
Line-10 – Aerocity to Tughlakabad
Location: Delhi Metro Line-10
DT-10 R – Installation Testing and Commissioning of Ballastless Track Including Supply of MSS & Buffer Stop for Line-10 (Aerocity – Tughlakabad)
- Year Of Completed: Ongoing
- Client: DMRC
- Type of Work: Ballastless Track
Line-2B – Andheri West to ITO (Mumbai Metro)
Location: Mumbai
Design, Supply, Installation, Testing and Commissioning of Standard gauge Ballastless track in main line from Andheri West to ITO Station of Line 2B of Mumbai Metro.
- Year Of Completed: Ongoing
- Client: MMRDA
- Type of Work: Ballastless Track
Major Bridges – JNH to PFM Section
Location: Rail Vikas Nigam Ltd.
Construction of Major Bridges no. 96 (12×6.10M PSC Slab), 131A (1×45.70M(OWG) & 148 (4×12.20M PSC slab) and other ancillary works between JNH-PFM section for doubling work.
- Year Of Completed: Ongoing
- Client: RVNL
- Type of Work: Major Bridge Construction
Jammu Tawi Coaching Terminal
Location: Jammu, Northern Railway
Construction of 4 Nos platforms with covered sheds, 5 nos. washing Lines, 7 nos Stabling Lines, Washable Apron for 7 lines, Water storage tanks with 2 tube wells, water supply arrangement, Parcel siding with high level covered platform, Sick line Shed and Building, including earthwork and other ancillary works in connection with Jammu-Second Entry – development of coaching terminal at Jammu Tawi Railway station.
- Year Of Completed: Ongoing
- Client: Northern Railway
- Type of Work: Terminal Civil Works
New Delhi Rajdhani & DLT Complex
Location: New Delhi Railway Station
Construction of all-weather covered shed over Washing No. 11 & 12 in Rajdhani complexand over Washing Line No.1 & 2 in DLT complex including construction of RCC overhead tank (225 KL), extension of service building, boundary wall & fencing, connecting road, 1 No. stabling cum examination line with RPC-IV facilities and other allied works in New Delhi Railway station for upgradation of existing coaching maintenance facilities for highspeed train in Delhi area.
- Year Of Completed: Ongoing
- Client: Northern Railway
- Type of Work: Infrastructure Upgradation