Our Project
An overview of the services you offer and how they will benefit the visitor.
Project Description
Construction of Major Bridges No. 96 (12*6.10 m PSC slab), 131A (1*45.70 m OWG) & 148 (4*12.2 m PSC Slab) and other ancillary works between JNH-PFM section of doubling work. |
Start Date: 04/10/2019
End Date: 31/12/2024
RVNL
Project Description
Construction of Ballast less Track (BLT) on elevated viaduct, underground tunnel, Station & Yard and other miscellaneous works from Chainage (-) 90m to 7195m i.e. Noapara to Bimanbandar yard in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar |
Start Date: 06/01/2021
End Date: 31/08/2024
Metro Railway, Kolkata
Project Description
Construction of all-weather covered shed over Washing No. 11 & 12 in Rajdhani complex and over Washing Line No.1 & 2 in DLT complex including construction of RCC overhead tank (225 KL), extension of service building, boundary wall & fencing, connecting road, 1 No. stabling cum examination line with RPC-IV facilities and other allied works in New Delhi Railway station for upgradation of existing coaching maintenance facilities for high speed train in Delhi area. |
Start Date: 09/02/2022
End Date: 31/07/2024
Northern Railways
Project Description
|
Start Date: 09/08/2022
End Date: 17/08/2024
DMRC
Project Description
|
Start Date: 23/11/2022
End Date: 22/11/2024
DMRC
Project Description
Construction of 4 Nos platforms with covered sheds, 5 nos. washing Lines, 7 nos Stabling Lines, Washable Apron for 7 lines, Water storage tanks with 2 tube wells,water supply arrangement, Parcel siding with high level covered platform, Sick line Shed and Building, including earthwork and other ancillary works in connection with Jammu-Second Entry – development of coaching terminal at Jammu Tawi Railway station
Start Date: 03/03/2023
End Date: 02/09/2024
Northern Railway
Project Description
Design, construction, manufacturing, supply, installation, testing & commissioning of ballast less trackwork in mainline from Kapurbawdi station (CH. -301.373 m) to Dhamankar Naka (CH. 13027.957 m) including third track near Kasheli station, depot entry / exit approach tracks for Line-5 corridor (Thane – Bhiwandi – Kalyan) of Mumbai Metro Rail Project of MMRDA, Mumbai |
Start Date: 08/02/2024
End Date: 17/06/2025
MMRDA
Project Description
Contract MT-09R: Installation, Testing & Commissioning of Ballastless Track including Supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli) (Ch. -822.508m to Ch. 14380.755m) |
Start Date: 03/03/2023
End Date: 07/02/2026
DMRC
Project Description
Ballastless Track Linking over Viaduct Sections on Main Line & Loop Lines including Setting up of Track Construction Base (TCB) on Viaduct at various locations (TCB 04 Nos) along the alignment including Flash Butt Welding of rails and Ballasted Track Linking along with various associated works in the Depots/Maintenance Depots at various locations along the alignment in connection with Construction of High Speed Double Line Railway Track between Zaroli Village at Maharashtra-Gujarat Border (MAHSR Km. 156.600) and Vadodara (MAHSR Km. 393.700) in the State of Gujarat and the Union Territory ofDadra and Nagar Haveli of Mumbai- Ahmedabad High Speed Rail (Package-MAHSR-T2) under NHSRCL |
Start Date: 22/03/2024
End Date: 21/02/2027
IRCON
Project Description
Construction of Reinforced Concrete Track Bed, RC Anchors and installation of Reference Pin in RC Anchor for Ballast less Track Section in between Zaroli Village at Maharashtra-Gujarat Border (MAHSR km 156.600) and Vadodara (MAHSR km 393.700) in the State of Gujarat and the Union Territory of Dadra and Nagar Haveli in connection with the Construction of Mumbai-Ahmedabad High Speed Rail Project |
Start Date: 19/04/2024
End Date: 18/04/2027
IRCON
Project Description
Proposed Connectivity of LPGCL (Lalitpur Power Generation Company Limited) siding at Tikamgarh End Taking off from LPGCL Cabin (Block Hut) between Tikamgarh – Udaipura Station |
Start Date: 28/02/2023
End Date: 31/12/2024
LPGCL
Project Description
Contract: P1-T06: Design,
Supply, Installation, Testing and Commissioning of Standard Gauge Ballastless Track for the Elevated Section of Reach-3 (Civil Court to Ramwadi)and Underground Section of Reach-4 (Range Hill to Swargate) of Pune Metro Rail Project.
Start Date: 19/04/2024
End Date: 18/04/2027
MMRD
Project Description
Design, Engineering & construction of Rail track and linking works including Civil, retaining wall, OHE and S&T works leading to connectivity of LPGCL Railway siding at Tikamgarh end between Tikamgarh Udaipura station of Jhansi division (NCR) for providing connectivity of railway siding of LPGCL to Tikamgarh end on the Lalitpur-Tikamgarh railway line in the North Central Railway section.
Start Date: 19/04/2024
End Date: 18/04/2027
Lalitpur Power Generation Company Limited
Project Description
Upgradation of Signal & Telecommunicatuion Work of SAGARA Railway Station under CKP division of South Eastern Railway on turnkey Basis.
Start Date: 19/04/2024
End Date: 18/04/2027
Shiva Cement Limited
Project Description
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV AC OHE IN CONNECTION WITH “ELECTRIFICATION OF EXISTING PFT SIDING & EXTENSION OF LINE No 3 & 4 OF HTPL AT PAWAL BY PROVIDING HIGH RISE OHE”
Start Date: 19/04/2024
End Date: 18/04/2027